The challenge
Transaction systems depend on infrastructure that cannot fail quietly. The institution needed to modernise servers, storage and power protection while keeping services running and strengthening the safeguards around its data.
Our approach
The upgrade was planned in phases around the institution’s operating windows, with compute, storage and power designed against the same availability requirements.
- Phased migrationChanges scheduled around operating windows.
- Compute & storageServer and storage platforms sized to workloads.
- Power protectionPower continuity planned with the room.
- Data safeguardsBackup and access controls around critical data.
Deployment scope
Technical details are published at a level that does not expose the client’s security design.
| Compute | HPE server platform |
|---|---|
| Storage & backup | QNAP storage with Seagate drives |
| Facility | Power and room infrastructure |
Outcomes
Site-reported From the previous website. Figures are withheld until verified.
- Operational stability Under review
- Transaction speed Under review
- Enhanced data safeguards Under review
Before a figure is published, IZONE needs the measurement method, the period measured and the client’s written approval.